PROJECTS
Explore our project experience across industrial and utility sectors. Each project reflects our commitment to quality engineering, reliable system integration, and long-term operational performance.
15+
Projects Delivered
24/7
Technical Support Availability
2
Technology Partners
10+
Industrial Application Supported
ALL PROJECTS
Browse our complete portfolio of completed projects. Every project reflects our commitment to quality engineering, reliable system integration, and long-term operational performance.
Have a project in mind?
Let's discuss the right solution for you
PT Tirta Surya Cipta (TSC) successfully delivered a 3 × 75 kW Variable Speed Drive (VSD) Control Panel for the Booster Pump System at PDAM Tirta Moedal Kota Semarang. The project was awarded by VEI B.V. – Dutch Water Operators through its Water Operator Partnership (WOP) program, supporting the development and improvement of water utility infrastructure in Indonesia. The system provides flexible pump operation through both remote and local control modes. Testing and commissioning were successfully completed on 7 October 2026, including parameter configuration for three 55 kW pump motors and verification of the configured control functions.
OUR ENGINEERING COMMITMENT
Solution designed around real operational requirements rather than one-size-fits-all approaches.
Careful implementation, testing, and commissioning to ensure dependable system performance.
Providing technical assistance and troubleshooting throughout project implementation and beyond.
Whether you need a booster pump upgrade, motor control integration, or a broader automation solution, our team is ready to help.
Consultation & Site Survey
We assess your needs on-site
Engineering & Solution Design
Tailored to your operational goals
Industry
Water Utilities & Infrastructure
Service
Engineering, Panel Integration, Testing & Commissioning
PT Tirta Surya Cipta (TSC) conducted a free 24-hour VSD trial for a 22 kW Cooling Tower Pump at PT Sari Takagi Elok Produk (STEP). The trial evaluated the energy-saving potential of converting the existing Star-Delta motor control to Variable Speed Drive (VSD) control.
Industry
Manufacturing
Service
Engineering, Installation, Testing & Energy Assessment
PT Tirta Surya Cipta (TSC) delivered the 315kW x 2, VSD pump control system for the Interkoneksi Bendungan Sepaku Semoi project, part of the water infrastructure supporting Indonesia’s new capital, Nusantara (IKN). The scope included engineering, fabrication, testing, installation support, and commissioning of VSD panels for the pumping system. With a highly compressed project schedule, TSC completed the panel fabrication within 8 days and successfully carried out testing and commissioning on 15 September 2026.
Industry
Water & Infrastructure
Service
Engineering, Panel Fabrication & Commissioning
Design, fabrication, and commissioning of a 55kW soft starter control panel engineered to drive heavy-duty transfer pumps at Jakarta Port, enabling the safe and efficient offloading of oil from marine tankers to onshore storage facilities.
Industry
Oil & Gas / Maritime Logistics
Service
Engineering, Assembly & Commissioning
Upgrade and modernization of an existing booster pump system to improve water pressure stability, system reliability, and operational efficiency for a commercial facility.
Industry
General Industry
Service
Engineering & System Design, Booster Pump Installation, Piping Integration, Control Panel Integration, Testing & Commissioning
Building lasting relationship through reliability, transparency, and consistent engineering support.
Support & After-Sales Service
Reliable support for long-term operations