PT Tirta Surya Cipta (TSC) delivered the 315kW x 2, VSD pump control system for the Interkoneksi Bendungan Sepaku Semoi project, part of the water infrastructure supporting Indonesia’s new capital, Nusantara (IKN). The scope included engineering, fabrication, testing, installation support, and commissioning of VSD panels for the pumping system. With a highly compressed project schedule, TSC completed the panel fabrication within 8 days and successfully carried out testing and commissioning on 15 September 2026.
Project Year
2026
Industry
Water & Infrastructure
Location
Nusantara (IKN), East Kalimantan, Indonesia
Service
Engineering, Panel Fabrication & Commissioning
PT Tirta Surya Cipta (TSC) delivered the 315kW x 2, VSD pump control system for the Interkoneksi Bendungan Sepaku Semoi project, part of the water infrastructure supporting Indonesia’s new capital, Nusantara (IKN). The scope included engineering, fabrication, testing, installation support, and commissioning of VSD panels for the pumping system. With a highly compressed project schedule, TSC completed the panel fabrication within 8 days and successfully carried out testing and commissioning on 15 September 2026.
If you already have a defined scope, technical requirement, or planned upgrade, submit a quote request and our team will review your project needs.
Consultation & Site Survey
We assess your needs on-site
Engineering & Solution Design
Tailored to your operational goals
Support & After-Sales Service
Reliable support for long-term operations